Test method | Pneumatic operated door switch 3 chambers |
Inner dimension (W*D*H) | 500*450*450mm |
External dimension (W*D*H) | 1380*1370*1980mm |
Temperature range | -40 ~ +80℃ |
High temperature chamber pre-heating range | 60 ~ 100℃ |
Heating speed | +60→+100℃ about 10 minutes |
Low temperature chamber pre-cooling range | -65 ~ 0 |
Cooling speed | Ambient →-65℃ about 65 minutes |
Temperature deviation | ±3℃ |
Thermal recovery time | Within 5 minutes |
External material | Antirust processing cold-rolled steel sheet |
Internal material | SUS#304 stainless steel |
Thermal insulation material | Polyurethane foam and fiberglass |
Coolant | R404A / R23 |
Cooling method | Air cooling |
Pressure | 0.2 - 0.5Mpa |
Power supply | Three phase, 380V, 50Hz |
Product number | HD-E703-200 | Brand | Haida |
---|---|---|---|
price | unit | Set | |
Minimum order quantity | 1 | Supply Capacity | 30 Set/Sets per Month |
payment method | L/C , T/T , D/A , | Certification | ISO,CE |
Place of origin | Guangdong, China | Packing details | Each set protected with resin fiber and PP film, then put into Strong wooden case with operation manual and video inside. |